Town of Paradise

The Final EIR is available for download here: pdf Final Black Olive Environmental Impact Report (5.52 MB)

The Draft EIR is available for download here: pdf Black Olive Draft Environmental Impact Report (DEIR) (Safeway) - Entire Report (25.74 MB) .

NOTICE OF PUBLIC HEARING - SPECIAL MEETING OF THE PARADISE PLANNING COMMISSION

NOTICE IS HEREBY GIVEN by the Paradise Planning Commission that a public hearing will be held on September 13, 2018 at 6:00 p.m. in the Paradise Town Hall Council Chambers, 5555 Skyway, Paradise, California regarding the proposed BLACK OLIVE VILLAGE PROJECT described below. The public hearing will be conducted to consider whether to approve the following matters:

  1. Adoption of a proposed resolution making findings of fact, a Statement of Overriding Considerations and a Mitigation Monitoring and Reporting Program in accordance with the California Environmental Quality Act for the Black Olive Village project.
  2. In addition, the proposed resolution would approve the Safeway, Inc. Use Permit (PL16-00263) and Tree Felling Permit (PL16-00264) applications: The project applicant is seeking Town of Paradise approval for Use Permit and Tree Felling Permit applications affecting a 7.63 acre land area comprised of five contiguous properties identified as Assessor Parcel Nos. 052-211-007, -21, -36 and -37 and 052-182-092, with mailing addresses as follows: 5795, 5825, 5833, 5851, and 5887 Skyway, located on the west side of the Skyway/Black Olive Drive intersection. The purpose of the requested application approvals is to facilitate the establishment of 67,743 square feet of retail uses, including a Safeway supermarket (54,471 square feet), 7,800 square feet of additional retail space, a 4,200 square foot restaurant pad, an 18 pump fueling center and all supporting site improvements. The project applicant is also proposing the felling and removal of 180 trees larger than 10 inches in diameter in order to accommodate development of the project.The environmental document and project application files are available for public inspection at the Town of Paradise, Development Services Department, Paradise Town Hall. If you challenge this matter in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Paradise Planning Commission at, or prior to, the public hearing. For further information please contact the Development Services Department (planning division), Town Hall, 5555 Skyway, Paradise, CA, (530) 872-6291, extension 111.                                                                       

Craig Baker, Community Development Director

Town of Paradise

5555 Skyway

Paradise, CA 95969

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Fax: (530) 877-5059

A.        Project Location

The proposed Black Olive Village project is located in the central part of the Town of Paradise in an urbanized area directly west of the intersection of Skyway and Black Olive Drive and comprises assessor parcel numbers: 052-211-007, -021, -036, and -037, and 052-182-092. The site is designated as Town Commercial (T-C) in the Town’s General Plan and is zoned Community-Commercial (C-C), which provides for a full range of commercial uses, including retail, restaurants, and service stations. A conditional use permit will be required due to the size of the project.

b.         Project Description

The proposed project would result in the construction and operation of 67,473 square feet of retail uses, which would include a Safeway supermarket (54,471 square feet) and 7,800 square feet of additional retail adjoining the store; a 4,200-square-foot restaurant pad that could accommodate high-turnover, sit-down restaurant; a 9-station (18 pumps) fueling center with canopy; a 1,002-square-foot fueling center kiosk; and a landscaped parking lot with 278 parking spaces. The Safeway store would operate seven days per week, 24 hours per day, and employ approximately 125 persons. The existing approximately 35,000-square-foot Safeway store in Old Town Plaza on Clark Road would be closed. A new use or tenant for the vacated store has not been identified, and there are no plans to demolish the space.

Off-site frontage improvements to Skyway to accommodate the proposed project would include a primary driveway entrance aligned opposite to Black Olive Drive (which would be a signalized intersection following improvements by the Town in 2017-18, unrelated to the proposed project); a secondary access driveway (northern driveway) for the fueling center; curb, gutter, and sidewalk; and a public bus turnout and shelter. Delivery truck access to the project is proposed via the northern driveway. Delivery trucks accessing the site would enter the site via the northern driveway, proceed to the two loading docks via a one-way route at the rear of the Safeway store, and exit via the primary driveway at Black Olive Drive. Smaller delivery trucks would use either driveway to access the site. The Safeway store loading docks would be below grade and use recessed bay doors with sealed gaskets to reduce noise from off-loading trailers. Local deliveries would be through an at-grade roll-up door and a Mondoor.

The project proposes a contemporary mountain theme for the supermarket building façade. The building would be accented with a mixture of gable roofs over the two main entries, varying roofline parapet offsets, architectural pop-outs, a mixture of wall finishes, an outdoor trellis, patio areas, and articulated entry vestibules. There would be two monument signs: one for the Black Olive shopping center (approximately 8 feet tall) and one with fuel prices. Perimeter landscaping would be designed to minimize sight-line impacts to nearby residential uses. Vegetation would be used to help screen buildings from view of vehicles traveling on Skyway. Parking lot lighting would consist of 20-foot-high fixtures that would be shielded to prevent the direct projection of light on adjacent properties.

Project development would involve the demolition and removal of approximately 22 existing residential and commercial structures on the site (approximately 9,300 square feet total), the clearing of land including the removal of approximately 180 trees larger than 10 inches in diameter, and cut/fill and grading to prepare a level site. A retaining wall would be installed on the west side of the site, along the rear of the building where the truck delivery access would be, and along a portion of the north side and southwest side. Water service for the proposed project would be provided by the Paradise Irrigation District. The project would include an on-site wastewater secondary treatment system. Stormwater from the proposed project would be collected into mechanical structures and treated in on-site stormwater detention basins prior to discharge into the Town’s stormwater drainage system.

B.         Required Approvals and Permits

Discretionary actions required to be taken by the Town of Paradise may include, but are not limited to, the actions listed below:

  • Certification of the EIR
  • Approval of architectural designs and landscape plans
  • Grading and building permits
  • Site plan approval
  • Conditional use permit approval
  • Issuance of tree-felling permits
  • Approval of lot line modifications

The EIR may be used to support additional subsequent approvals, determinations, and/or permits that may be required from local, regional, state, or federal agencies in the processing of the proposed project; agencies include, but are not limited to:

  • Regional Water Quality Control Board, Central Valley Region (Region 5)
  • Butte County Air Pollution Control District
  • Butte County Environmental Health
  • State Water Resources Control Board

C.         Significant Environmental Effects

The Draft EIR includes a detailed analysis of the proposed project’s potentially significant effects on aesthetics, air quality, greenhouse gas emissions/climate change, noise, and traffic.

D.        Availability of Draft and Final EIR

The Draft EIR is available for download here: pdf Black Olive Draft Environmental Impact Report (DEIR) (Safeway) - Entire Report (25.74 MB) .

The FINAL EIR is available for download here: pdf Final Black Olive Environmental Impact Report (5.52 MB)

The Draft and Final EIR are also available for review during normal business hours at the following locations:

Town of Paradise

5555 Skyway

Paradise, CA 95969

(530) 872-6291

Butte County Library

5922 Clark Road

Paradise, CA 95969

(530) 872-6320

 

All documents referenced in the Draft and Final EIR are available upon request by contacting Mr. Baker at (530) 672-6291 or by email at This email address is being protected from spambots. You need JavaScript enabled to view it..

You are here: Home News & Events Notice of Availability of the Final Environmental Impact Report (EIR) (Safeway)

Contact us

Town Hall

5555 Skyway

Paradise, CA 95969

(530) 872-6291 phone

(530) 877-5059 fax

Monday - Thursday

8:00 a.m. to 5:00 p.m.