| New Investigation Sgt at PD |
Increased hours for AC Officer |
Funds for 2 Animal Control Officers |
| Sponser 2 Police Academy Cadets |
Training for Animal Control Officer |
Training for AC Officers |
| 3 Police cars (Ford Interceptors) |
Animal Control System Training |
Computer for AC Supervisor |
| Police Body Cameras |
Supplies for Animals at the Shelter |
Online dog licensing maintenance |
| Enhanced Police Officer training |
Online Dog Licensing setup |
Concrete Repair at Animal Shelter |
| LiveScan Machine for Police Dept. |
Maintain Cal Fire Contract |
Maintain Cal Fire Contract |
| Police Dept. siding and repairs |
New Fire Engine |
Payments on two new Fire engines previously acquired |
| Maintain Cal Fire Contract |
Matching funds for SCBU's |
3 new Police Vehicles |
| New Fire Engine |
2nd Detective for Police Department |
Body Cameras (yr 3 of 5) |
| Firefighter breathing apparatus |
3 new Police Vehicles |
Police Officer Training |
| Exhaust extraction unit for Fire Station |
Body Cameras (Year 2 of 5) |
K9 Program, food, vet costs |
| Increased Hours for AC Officer |
Police Officer Training |
Police Dept. Roof Replacement |
| Pressure Washer/Sanitation Unit for Animal Shelter |
K9 Program, food, vet costs |
Sponsor 2 Police Academy Cadets |
| Pedestrian Safety Crossings |
Sponsor 2 Police Academy Cadets |
Maxwell Dr. Safe Routes to School |
| Pearson Rd. Overlay/Drainage |
Emergency 9-1-1 MIS |
Bille Rd. Overlay from Fern to Oliver |
| |
Patrol Cameras with durable cases |
10% Fixed Reserve |
| |
Sawmill Peak Communication Study |
|
| |
PD Men's Locker room floor repair |
|
| |
2nd Phase of PD Siding replacement |
|
| |
2016 Road rehabilitation project |
|